eighteen miles of track, in addition to the labor of troops, was as follows:
Cost of bridge, as per settlement of General Winslow with Grant & Co., builders, and approved by General Wilson:
725 feet (lineal) of bridging, at $11 per foot........... $7,975
Amount due for track laying, as per check rolls,
approved as above......................................... 7,167
Amount of work done at culvert near Vining's, approved
as above.................................................. 528
-------
Total amount..............................................15,670
The above amount ($15,670) I think is justly chargeable to construction, and would therefore respectfully recommend its payment. The work was done by order of Major-General Wilson, commanding Cavalry Corps in Georgia, and at a cost less perhaps than we could have done it ourselves, besides very materially expediting the completion of the road.
At Atlanta we have put down extensive side-tracks, amounting in the aggregate to over three miles,and have erected a large freight platform 400 feet in length by 30 in width, with a shed roof over part of it. Upon the completion of the road to Atlanta, and after having put the track in a thorough condition, I again commenced a reduction of the corps, which at this date amounts to but little over 200 men. With the small bridge force retained, I am putting the Howe truss bridge, ordered for Allatoona Creek a year ago, and stored at Chattanooga, across the chasm in the bank, near Vining's produced by the destruction of the culvert before alluded to. The break is upward of 100 feet in width and gradually increasing, and the trestle around it on so insecure a foundation I have thought it advisable to substitute it with a bridge. The balance of my track force are gathering up the crooked iron the Chattanooga and Atlanta road. Below please find a recapitulation of work done in June and July, expenditure of material, amount of iron manufactured at rolling-mill, and amount of pay-rolls for June and July, exclusive of wages paid at rolling-mill.
Summary of work done on the Chattanooga and Atlanta Railroad during June and July, 1865; 28 miles of track repaid; 41 miles of track surfaced and repaired; 525 feet (lineal) of bridging; 42,000 cross-ties cut and delivered; 3,000 cubic feet of timber cut; 5 water-tanks erected; 20 switches and frogs put in.
Expenditure of material: 14,794 iron rails (20 feet long), 18,000 chairs, 1,140 kegs railroad spike, 60 kegs bridge spike, 20 frogs and switches, 5 water-tanks (complete), 3,000 cubic feet timber, 42,000 cross-ties.
Cost of labor in June and July: Amount of pay-roll for June, $117,866.91; for July, $76,361.
Report of iron manufactured at U. S. Military Railroad rolling- mill at Chattanooga, Tenn., up to July 31, 1865.
Date. Articles. Manufactured Issued. On hand.
To June Iron rails Pounds. Pounds. Pounds.
1, 1865
2,264,320 916,026 1,348,294
To June ...do... 1,156,292 ---- 2,504,586
30, 1865
To July ...do... 1,365,100 28,492 3,841,194
31, 1865
Total
---------
4,785,712 944,518 ---
Tons.
Manufactured to date................................ 2,136
Issued to date...................................... 421
------
On hand to date..................................... 1,715